Cost Certainty
The GMP locks in your maximum price before ground breaks. You budget with confidence, and overruns above the cap are our responsibility — not yours.
A Design-Build project with a Guaranteed Maximum Price unites design and construction under one accountable team — protecting your budget, compressing your schedule, and removing the guesswork from your build.
Design-Build places architecture, engineering, and construction under a single contract — one team, one responsibility, one goal. A Guaranteed Maximum Price (GMP) then caps your total project cost. Richardson Construction Management absorbs the risk of overruns above that ceiling, while any savings below it flow back to you. The result is a transparent, collaborative, open-book partnership built on trust from day one.
Why owners and developers choose the Design-Build GMP model with RCM.
The GMP locks in your maximum price before ground breaks. You budget with confidence, and overruns above the cap are our responsibility — not yours.
One contract, one team, one point of contact. No finger-pointing between designer and builder — RCM owns the outcome from concept through closeout.
Design and construction overlap rather than run in sequence. Long-lead items are ordered early and permitting advances in parallel, shrinking your timeline.
Builders sit at the table during design. Constructability reviews and value engineering happen up front — when changes are still inexpensive to make.
Every cost, subcontractor bid, and line item is visible to you. The GMP is built on documented numbers, not a black box — you see exactly where your dollars go.
Come in under the guaranteed maximum and the difference is returned to you (or split per agreement). Efficiency is rewarded, and incentives stay aligned.
An integrated team resolves conflicts in design — not in the field. That means fewer surprises, fewer disputes, and a smoother path to completion.
Design coordination, cost control, and schedule risk shift to RCM. You stay focused on your vision while we manage the complexity behind the scenes.
We align on your vision, program, and budget, then develop the design collaboratively.
As design firms up, we build and present a transparent Guaranteed Maximum Price.
Construction proceeds under the cap with open-book reporting at every milestone.
We hand over a finished project and return any savings realized below the GMP.
Let's discuss whether a Design-Build GMP approach is right for your next project.
Start the ConversationBuilding Visions. Managing Success.
*Schedule savings vary by project. Figures are illustrative of typical Design-Build outcomes versus traditional design-bid-build.
RICHARDSON
|
GET A QUOTE 949.592.3995
|
CORPORATE OFFICE777 E. Ocean Blvd
Long Beach CA 90802 |